Return to index

5 Apr 2008 - VILLAGE HALL TRUSTEES

TRUSTEES MEETING                  

The village hall trustees met on March 26 with John Evans in the chair.  New conditions of hire have been introduced and these will need to be signed or re-signed by all future users of the hall.

Grant applications will shortly be made for refurbishment of the kitchen including a new cooker and the construction of a ramp for wheelchair access to replace the existing steep steps. The guttering around the hall is to be repaired and hopefully will alleviate some of the damp from which the hall suffers.

 

Powered by Recipero Working together with BT